PO # 17-6010 / $37,500.00 – Laguna Hotel Fire Alarm

Project Completed: 2017

GC: Watson Electric; Tulsa, OK

SOW: Install fire alarm system.

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical, Panel, Keypad, Alarm, Transmitter

(Completed Under DUNS # 080290309)

 

PO # 17-1037 / $33,192.00 – Union Aruba License and Support

Project Completed: 2017

Prime Contractor; Tulsa, OK

SOW: Provide Aruba licensing for two years.

NAICS: 423430 Computer and Computer Peripheral Equipment and Software Merchant Wholesalers

Keywords: Software License

(Completed Under DUNS # 080290309)

 

PO # 17-5027 / $104,793.00 – Hooter’s N. Penn Remodel

Project Completed: 2017

GC: Rand Construction; Oklahoma City, OK

SOW: Relocate panels, provide new circuitry. Install light fixture package. Provide low-voltage cabling, temporary power and lighting.

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical, Panel, Circuits

(Completed Under DUNS # 080290309)

 

PO # 17-3126 / $25,998.00 – Kay’s Jewelers Edmond (17-3126)

Project Completed: 2017

GC: Lakeview Construction; Tulsa, OK

SOW: Install electrical equipment, provide temporary power and lights, to panels, switches, and outlets, including data rough in. Install electrical and low-voltage cabling.

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical, Panel, Circuits, Cabling, Power

(Completed Under DUNS # 080290309)

 

PO # 17-3106 / $31,186.00 – Kay’s Jewelers Bartlesville (17-3106)

Project Completed: 2017

GC: Lakeview Construction; Tulsa, OK

SOW: Install electrical equipment, provide temporary power and lights, to panels, switches, and outlets, including data rough in. Install electrical and low-voltage cabling.

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical, Panel, Circuits, Cabling, Power

(Completed Under DUNS # 080290309)

 

PO # 15832849 / $81,887.00 – Kimberly Clark Turnstile (17-2214)

Project Completed: 2017

Prime Contractor; Tulsa, OK

SOW: Provide and install Turnlock turnstile, canopy, wiring, lighting, and fencing.

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical, Panel, Circuits

(Completed Under DUNS # 080290309)

 

PO # 17-3068 / $81,887.00 – Soft Surroundings Classen Circle

Project Completed: 2017

GC: Horizon Retail; Tulsa, OK

SOW:

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical, Panel, Circuits

(Completed Under DUNS # 080290309)

 

PO # 16-596 / $39,868.00 – Tulsa ANG Service Rebuild

Project Completed: 2017

GC: Griffith Contracting; Tulsa, OK

SOW:

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical, Panel, Circuits

(Completed Under DUNS # 080290309)

 

PO # 17-5053 / $39,850.00 – Climate Master New Test Equipment Power

Project Completed: 2017

Prime Contractor; Tulsa, OK

SOW: Install electrical panels and disconnects on Unistrut racks. Install conduit and wire for branch circuits and panel feeds.

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical, Panel, Circuits

(Completed Under DUNS # 080290309)

 

PO # W912L617P0098 / $24,250.00 – Tulsa ANG Hush House Boring (17-1053)

Project Completed: 2017

Prime Contractor; Tulsa, OK

SOW: Directional Bore paths to provide pathway for 2ea, 4in SCH 40 Conduit to support the expansion of the Manhole Distribution System on the Flight Line in Tulsa ANGB, OK.

NAICS: 237990 Other Heavy and Civil Engineering Construction

Keywords: Boring, Project Manager, Construction

(Completed Under DUNS # 080290309)

 

PO # 17-5040 / $25,993.00 – Fazoli’s Electrical #170100

Project Completed: 2017

GC: ACT Construction; Oklahoma City, OK

SOW: Install circuits and devices, provide temporary power and lighting, and install customer provided lighting package.

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical wiring, junction boxes, panel boards, lighting

(Completed Under DUNS # 080290309)

 

PO # 17-2090 / $23,433.00 – W&W Relocate Transfer Switch

Project Completed: 2017

Prime Contractor; Tulsa, OK

SOW: Remove existing automatic transfer switch and relocate, and existing 480v panel. Set junction box above ceiling at existing MDF closet, set junction box in ceiling. Locate and intercept existing conduit in ceiling. Intercept existing control conduit and wiring to extend to the new location. Remove existing panel board and suspended for transfer switch and overcurrent protection of generator wiring. Remove all electrical panel boards and transformers in existing MDF closet.

NAICS: 221121 Electric Bulk Power Transmission and Control, 221122 Electric Power Distribution, 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical wiring, switches, junction boxes, panel boards, transformers

(Completed Under DUNS # 080290309)

 

PO # 17-3005 / $84,644.00 – Wiljo Interiors New Facility

Project Completed: 2017

Prime Contractor; Broken Arrow, OK

SOW: Install underground electrical wire. Provide and install LED lighting. Provide conduit and wiring.

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors

Keywords: Electrical wiring, LED lighting, occupancy sensors

(Completed Under DUNS # 080290309)

 

PO # B07-17 2-3 / $30,000.00 – US Corp Of Engineers Tulsa Building 2nd Floor (17-2052)

Project Completed: 2017

Prime Contractor; Tulsa, OK

SOW: Provide all labor and materials needed for the immediate Data cabling of the 2nd floor USACE office spaces in accordance with USACE requirements and specifications.

NAICS: 238210 Electrical Contractors and Other Wiring Installation Contractors, Electrical, electrical wiring, and low voltage electrical work

Keywords: Data cabling, low-voltage

(Completed Under DUNS # 080290309)

 

PO # 80020-01 / $520,490.00 – US Corp Of Engineers Tulsa City Plex Towers Electrical & Communication (17-2004)

Project Completed: 2017

GC: Advance Construction Services; Tulsa, OK

SOW: Provide and install data and telecommunication cabling for new construction of building.

NAICS: 238210 Electrical, electrical wiring, and low voltage electrical work

Keywords: Data cabling, telecommunications, wiring

(Completed Under DUNS # 080290309)

 

PO # 23170051-10 / $62,933.00 – Bath & Body Works Electrical (17-3012)

Project Completed: 2017

GC: Horizon Retail Construction; Tulsa, OK

SOW: Installation of floor boxes, core drilling of floor boxes, fire proofing floor boxes. Install back boxes and stub ups only for Fire Alarm devices, provide and install power to Fire Alarm system. Remove and relocate electrical items at Manager’s desk to include receptacle and data cabling outlet for ALL System, relocate rough in for Drinking Fountain. Re-work existing conduit, wiring and meter that currently feeds the digital/Monitoring meter and to completely remove the old AEP meter. Install a new junction box at the old meter location, provide and install insulated taps for the existing wiring.

NAICS: 238210 Electrical, electrical wiring, and low voltage electrical work

Keywords: Electrical cabling and wiring, fire protection

(Completed Under DUNS # 080290309)

 

PO # 17-6008 / $34,013.00 – Jim Glover Owasso: Data, Camera, & AP (17-6008)

Project Completed: 2017

Prime Contractor; Owasso, OK

SOW: Provide and install cabling for data, cameras, and paging system, to include patch panels, cable management, and mounts.

NAICS: NAICS: 238210 Electrical, electrical wiring, and low voltage electrical work, Surveillance system, installation only,

Keywords: Data cabling and wiring, security cameras, paging system

(Completed Under DUNS # 080290309)